Electrical Supply & Services to Floating Facility

2016

Cullys worked alongside AME Pty Ltd to install 3 phase power to a barge from the existing jetty power, including:

  • Installation of 1 circuit breaker at the jetty Switchboard
  • Installation of 110m of 3 phase cable in a suitable conduit from the jetty to the start of the barge ramp

GET IN TOUCH TODAY

Whether its business or leisure, trust Cullys for the job!