2016
Cullys worked alongside AME Pty Ltd to install 3 phase power to a barge from the existing jetty power, including:
- Installation of 1 circuit breaker at the jetty Switchboard
- Installation of 110m of 3 phase cable in a suitable conduit from the jetty to the start of the barge ramp