CV03 Trash Grid Project

In 2023 Cullys had the pleasure to work with M&A Steel Fabrications and CBH to complete upgrades on a BM Mech CV03 Trash Grid.
 
The trash grid consists of a motor control Centre, actuator panel & junction box, blocked chute detector, trap door actuator and the conveyor 203. The system has a design capacity of 1,000 t/h and is used to convey a full range of grains. The need was to provide a final screening function to remove oversized particles before loading grain into containers for dispatch.
 
Cully team were able to aid this need by fabricating a junction box, Trash Grid Control Panel and Cabinet from within our own workshop and then later installing with over 250 meter’s of cabling onsite.

GET IN TOUCH TODAY

Whether its business or leisure, trust Cullys for the job!